<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>The Solar House Project — Engineering Guides</title>
    <link>https://solarhouseproject.com/guides/</link>
    <description>Independent US residential solar, electrical (NEC 220/690/705), battery backup, and heat pump engineering guides from The Solar House Project.</description>
    <language>en-us</language>
    <lastBuildDate>Fri, 27 Nov 2026 12:00:00 GMT</lastBuildDate>
    <atom:link href="https://solarhouseproject.com/feed.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>200-Amp Electrical Panel Upgrade Cost (2026 NEC Breakdown)</title>
      <link>https://solarhouseproject.com/guides/200-amp-electrical-panel-upgrade-cost/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/200-amp-electrical-panel-upgrade-cost/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>Electrical</category>
      <description>2026 US 200A electrical panel upgrade costs ($2,500–$4,800 overhead; $4,500–$8,500 trenched), NEC 220/120 load checks, and when an EVEMS saves $3,000. A 2026 residential 200-amp electrical panel upgrade costs $2,500 to $4,800 for full overhead service and $4,500 to $8,500 when underground trenching is required.</description>
    </item>
    <item>
      <title>Home Solar Panel Cost &amp; Real Payback Math in 2026</title>
      <link>https://solarhouseproject.com/guides/home-solar-panel-cost-payback-2026/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/home-solar-panel-cost-payback-2026/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>Solar &amp; Storage</category>
      <description>2026 US solar pricing ($2.55–$3.20/W), P.L. 119-21 tax shift (0% 25D cash vs 30% 48E TPO lease/PPA), net metering rules, and battery payback math. In 2026, an 8.4 kW US residential solar array costs $21,500–$27,000 cash. With Section 25D expired (P.L. 119-21), state incentives and 30% 48E TPO leases reshape payback.</description>
    </item>
    <item>
      <title>Level 2 EV Charger Home Install Cost &amp; 240V Circuit Guide</title>
      <link>https://solarhouseproject.com/guides/ev-charger-home-installation-guide/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/ev-charger-home-installation-guide/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>Electrical</category>
      <description>2026 Level 2 EV charger installation costs ($650–$2,200), NEC 625 continuous-load sizing (60A breaker for 48A), GFCI rules, and hardwired vs NEMA 14-50 safety. Installing a home Level 2 EV charger in 2026 costs $650 to $1,500 near the garage panel and $1,600 to $2,800 for long wire runs, with hardwired 48A units proving safest.</description>
    </item>
    <item>
      <title>Federal Pacific Stab-Lok &amp; Zinsco Panels: Hazard &amp; Cost</title>
      <link>https://solarhouseproject.com/guides/federal-pacific-zinsco-electrical-panels/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/federal-pacific-zinsco-electrical-panels/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>Electrical</category>
      <description>Why Federal Pacific Stab-Lok, Zinsco, and Challenger panels fail to trip, why US insurers deny coverage, and 2026 replacement costs ($1,900–$4,600). Federal Pacific Stab-Lok and Zinsco breaker panels fail independent trip tests at high rates, trigger US home insurance rejections, and cost $1,900–$4,600 to replace in 2026.</description>
    </item>
    <item>
      <title>Aluminum Branch Wiring (1965–1973): AlumiConn Retrofit Cost</title>
      <link>https://solarhouseproject.com/guides/aluminum-wiring-hazard-alumiconn-retrofit/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/aluminum-wiring-hazard-alumiconn-retrofit/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>Electrical</category>
      <description>CPSC-approved fixes for 1965–1973 single-strand aluminum branch wiring: why brass/steel outlet screws fail, AlumiConn vs COPALUM costs, and insurance acceptance. Single-strand aluminum branch wiring (1965–1973) is 55× more likely to reach fire-hazard temperatures at outlets; CPSC-approved AlumiConn retrofits cost $2,400–$5,500.</description>
    </item>
    <item>
      <title>Generac Standby Generator vs Solar Battery (2026 Math)</title>
      <link>https://solarhouseproject.com/guides/standby-generator-vs-solar-battery-backup/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/standby-generator-vs-solar-battery-backup/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>Solar &amp; Storage</category>
      <description>Head-to-head 2026 comparison of Generac 22kW standby generators vs Tesla Powerwall 3 / LFP home batteries: install cost, AC surge (LRA), multi-day outages, and 10-yr TCO. A 22kW Generac standby generator costs $11,500–$17,500 installed and runs indefinitely on natural gas, while 1–2 LFP batteries cost $13,000–$24,000 and cut daily electric bills.</description>
    </item>
    <item>
      <title>Heat Pump vs Gas Furnace (2026): State Fuel-Cost Math</title>
      <link>https://solarhouseproject.com/guides/heat-pump-vs-gas-furnace-2026/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/heat-pump-vs-gas-furnace-2026/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>HVAC &amp; Heat Pumps</category>
      <description>Honest 2026 comparison of cold-climate heat pumps vs high-efficiency gas furnaces: COP math, state electric-to-gas price ratios, dual-fuel balance points, and costs. In 2026, a seasonal COP 3.0 heat pump beats a 95% AFUE gas furnace on operating cost whenever your electric-to-gas ratio (¢/kWh ÷ $/therm) stays below ~10.8×.</description>
    </item>
    <item>
      <title>Mini-Split Sizing Chart &amp; Multi-Zone Install Cost (2026)</title>
      <link>https://solarhouseproject.com/guides/mini-split-sizing-installation-cost/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/mini-split-sizing-installation-cost/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>HVAC &amp; Heat Pumps</category>
      <description>2026 ductless mini-split sizing chart (9,000–36,000 BTU), single vs multi-zone installed costs ($3,500–$16,000), why oversizing causes humidity, and top brands. Professional ductless mini-split installation in 2026 costs $3,500–$5,800 for a single zone (9k–12k BTU) and $9,500–$16,500 for a 3- to 4-zone whole-home system.</description>
    </item>
    <item>
      <title>SEER2 Rules &amp; EPA R-454B Refrigerant Transition (2026)</title>
      <link>https://solarhouseproject.com/guides/seer2-r454b-hvac-transition-guide/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/seer2-r454b-hvac-transition-guide/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>HVAC &amp; Heat Pumps</category>
      <description>Complete 2026 homeowner guide to the EPA R-410A phase-down, R-454B vs R-32 A2L refrigerants, regional SEER2 minimums, and whether to repair or replace an R-410A unit. In 2026, most new US residential AC and heat pumps ship on low-GWP A2L refrigerants (R-454B or R-32), while EPA’s July 2026 rule still permits qualifying pre-2025 R-410A inventory.</description>
    </item>
    <item>
      <title>Roof Before Solar: Detach &amp; Reset Cost Math (2026)</title>
      <link>https://solarhouseproject.com/guides/roof-before-solar-replacement-math/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/roof-before-solar-replacement-math/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>Solar &amp; Storage</category>
      <description>Exact 2026 engineering rules on roof age before installing solar panels, real solar detach-and-reset (D&amp;R) costs ($200–$350/panel), and shingle vs standing-seam metal math. Removing and reinstalling a 20-panel solar array for a mid-life roof replacement costs $4,200 to $7,500 in 2026 — replace any asphalt roof with under 12–15 years left first.</description>
    </item>
    <item>
      <title>Solar Inverter Error Codes: SolarEdge, Enphase &amp; Generac</title>
      <link>https://solarhouseproject.com/guides/solar-inverter-error-codes-reference/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/solar-inverter-error-codes-reference/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>Diagnostics</category>
      <description>2026 diagnostic table for SolarEdge (18xB6 Riso, 3x6E AFCI, 2x Grid), Enphase IQ8 Gateway, and Generac PWRcell fault codes — DIY reset vs licensed tech. SolarEdge Error 18xB6 (DC Isolation) and 3x6E (AFCI) require professional rooftop DC testing, while Enphase Gateway offline alerts are often simple Wi-Fi or AC breaker resets.</description>
    </item>
    <item>
      <title>HVAC &amp; Furnace Error Codes + AC Capacitor Replacement</title>
      <link>https://solarhouseproject.com/guides/hvac-capacitor-furnace-error-codes/</link>
      <guid isPermaLink="true">https://solarhouseproject.com/guides/hvac-capacitor-furnace-error-codes/</guid>
      <pubDate>Fri, 27 Nov 2026 12:00:00 GMT</pubDate>
      <category>Diagnostics</category>
      <description>Decode Carrier Code 33, Goodman 1/4 flash, Trane &amp; Lennox lockout codes, plus why a failed dual-run AC capacitor is a leading summer breakdown ($180–$420 pro repair). A failed dual-run film capacitor is a leading cause of summer US central AC breakdowns ($180–$420 pro repair), while Carrier Code 33 and Goodman 4-flash signal airflow overheating.</description>
    </item>
  </channel>
</rss>
