APsystems APstorage3k-5HG-1P-NA (4.8 kWh)
3.68 kW, 4.8 kWh, 240Vac lithium ion energy storage system. Source: CEC Energy Storage System List (Nov 2026) · CEC listing date: · Registry snapshot: .

Storage Specifications & Safety Listing
| Manufacturer | APsystems |
|---|---|
| Model Number (MPN) | APstorage3k-5HG-1P-NA |
| Battery Chemistry | LFP (LiFePO4) |
| Usable Energy Capacity | 4.8 kWh |
| Max Continuous Discharge | 3.68 kW |
| Round-Trip Efficiency (RTE) | 90% (Class Estimate — Not listed in CEC) |
| PV DC Input (DC-Coupled) | AC-Coupled / External Hybrid Inverter |
| Nominal AC Grid Voltage | 240 Vac |
| Safety Listing | UL 9540 (Ed. 2 : 2020) |
| Certifying Laboratory | CSA Group |
Single-Unit Blackout Runtime Estimates
Modeled as usable kWh × √(RTE) ÷ load kW (4.8 kWh × 94.9% one-way discharge efficiency) with no solar recharge. Reserve buffer (e.g., 10%–20% user reserve) reduces usable outage hours proportionally.
| Light Essentials (0.8 kW — fridge, Wi-Fi, lights) | 5.7 hrs |
|---|---|
| Standard Backup (1.5 kW — + sump/freezer/home office) | 3 hrs |
| Heavy Load / HVAC (4.5 kW continuous) | Needs ≥4.5 kW output (stack 2+ units) |
Multi-Unit Stacking Matrix
| Units | Total kWh | Cont. kW | 1.5 kW Backup | 4.5 kW HVAC |
|---|---|---|---|---|
| 1× | 4.8 kWh | 3.7 kW | 3.0 hrs | N/A (<4.5 kW) |
| 2× | 9.6 kWh | 7.4 kW | 6.1 hrs | 2.0 hrs |
| 3× | 14.4 kWh | 11.0 kW | 9.1 hrs | 3.0 hrs |
| 4× | 19.2 kWh | 14.7 kW | 12.1 hrs | 4.0 hrs |
Outage Sizing Notes & FAQ — APsystems APstorage3k-5HG-1P-NA
When sizing a residential storage bank around the APsystems APstorage3k-5HG-1P-NA (4.8 kWh usable, 3.68 kW continuous), evaluate both energy duration (kWh) and peak starting current (kW / LRA). On a typical 1.5 kW essential-loads subpanel, one unit delivers roughly 3 hours overnight before morning solar recharge begins. Under California NEM 3.0 or Time-of-Use (TOU) arbitrage rates, shifting 8–12 kWh per evening peak window aligns well with a single- or dual-unit stack, while multi-day winter storms or whole-home 240V central AC generally require 2× stacked units plus a compressor soft-start kit.