Open Formulas & Primary Standards

Engineering Methodology & Primary US Data Sources

Every calculation inside our 7 browser tools and 5 469-model equipment directory traces to published US engineering standards and public federal/state datasets — never arbitrary marketing mark-ups.

Primary Public Datasets & Standards Referenced

DomainPrimary Authority / StandardHow It Powers Our Tools
Solar Equipment RegistryCalifornia Energy Commission (CEC) Solar Equipment ListsPrimary PTC/STC module specs, inverter CEC efficiency, MPPT voltage windows & UL 9540 battery listings
Solar Irradiance & LibrariesNREL PVWatts v8 / NREL SAMState-level Peak Sun Hours (PSH), latitude tilt/azimuth screening & supplemental PV/inverter model parameters
Electricity & Gas RatesU.S. EIA Form 861 & Electric Power Monthly51-state (50 states + DC) residential ¢/kWh & $/therm operating cost baselines
Electrical Load & PV CodeNFPA 70 (NEC 2023 Art. 220.82, 690.7 & 705.12)Optional dwelling load calculation, cold-weather string Voc limits & 120% busbar backfeed rule
HVAC Load & RefrigerantsACCA Manual J / DOE SEER2 / EPA AIM ActPreliminary IECC climate-zone BTU/h screening estimates & R-454B / R-32 efficiency comparisons
State & Utility IncentivesDSIRE (NC Clean Energy Technology Center)Active 2026 state tax credits, SRECs, net-metering rules & HEAR/HOMES rebate benchmarks
Federal Tax Credit StatusIRS Home Energy Tax Credits (P.L. 119-21)Verification that residential Section 25D & 25C expired Dec 31, 2025, while commercial Section 48E TPO remains distinct

Current Registry Snapshot Dates

Registry / Catalog MetricCurrent Value
CEC Solar Equipment List Snapshot2026-11-23
NREL SAM Library Snapshot2026-06-23
Last Catalog Build Update2026-11-27
Indexed Hardware Models5 469 total (3 007 panels · 1 903 inverters · 559 batteries · 441 brands)

Data Provenance Levels

To keep our datasheets transparent and auditable, every equipment parameter falls into one of three tiers:

  • CEC-Listed / Registry Verified: Direct laboratory or certification figures published in the California Energy Commission or NREL SAM datasets (e.g., STC wattage, Voc, Vmp, Isc, Imp, CEC weighted efficiency, UL 9540 status).
  • Derived / Estimated: Engineering values calculated transparently from primary registry inputs (such as cold-weather Voc(-10°C), NEC 125% continuous breaker sizing, single-unit blackout runtime, or explicitly flagged category defaults when an auxiliary dimension or temperature coefficient is absent from the registry).
  • Not Reported: Fields absent from public source registries are marked as not reported rather than fabricated.

Core Engineering Formulas

  • Cold-Weather String Voltage (NEC 690.7): Voc_cold = Voc_STC × [1 + (β_Voc / 100) × (T_min - 25°C)]. Max modules per series string = floor(Vdc_max / Voc_cold).
  • Backfeed Breaker & 120% Busbar Rule (NEC 705.12): I_breaker = ceil_standard((P_ac / V_ac) × 1.25). Standard residential backfeed allowance = (Busbar_A × 1.20) - Main_Breaker_A; exceeding this triggers a line-side tap or main-breaker derate warning.
  • Dwelling Electrical Load (NEC 220.82 Optional Method): General lighting (3 VA/sq ft) + small-appliance/laundry circuits + fastened appliances at 100% of first 10 kVA and 40% of remainder, plus 100% of largest HVAC load and EVSE continuous load.
  • Battery Blackout Runtime: Hours = (Usable_kWh × 0.90 DoD × Round_Trip_Efficiency) / Continuous_Load_kW (assuming zero solar recharge during outage).

Important Planning Limitations

Browser calculators are residential engineering pre-design tools. The 3D Solar Lab provides state-level solar screening estimates (not site-specific LiDAR shading), and the Heat Pump Sizing Studio is a preliminary IECC climate-zone load estimator (not a formal room-by-room ACCA Manual J/S/D calculation). Before purchasing equipment or pulling permits, a state-licensed master electrician must verify your exact service-entrance conductors, utility transformer capacity, and local AHJ amendments, and a licensed HVAC contractor must perform a formal Manual J/S/D calculation.