SP CEC-Listed · ResidentialUL 9540 (Ed. 3 : 2025)LFP (LiFePO4)

Shenzhen Poweroak Newener EnergyPro 13K+EnergyPack 500X2 (9.6 kWh)

13.2 kW, 9.6 kWh, energy storage system. Source: CEC Energy Storage System List (Nov 2026) · CEC listing date: · Registry snapshot: .

Usable Energy
9.6 kWh
Continuous Output
13.2 kW
Round-Trip Eff.
85.6%
1.5 kW Outage Runtime
5.9 hrs
Backup & Kit Actions
Compare vs Standby Generator →
Shenzhen Poweroak Newener EnergyPro 13K+EnergyPack 500X2 — Illustrative category photo — not this exact model (residential battery & home backup system)
Illustrative category photo — not this exact model (residential battery & home backup system)The Solar House Project Editorial Archive
SINGLE-UNIT OUTAGE RUNTIME (9.6 kWh · 13.2 kW · LFP (LIFEPO4)) Light Load (0.8 kW) 9.2 hrsEssentials (1.5 kW) 4.9 hrsWhole-Home + HVAC (4.5 kW) 1.6 hrs

Storage Specifications & Safety Listing

Shenzhen Poweroak Newener EnergyPro 13K+EnergyPack 500X2 Technical Specifications
ManufacturerShenzhen Poweroak Newener
Model Number (MPN)EnergyPro 13K+EnergyPack 500X2
Battery ChemistryLFP (LiFePO4)
Usable Energy Capacity9.6 kWh
Max Continuous Discharge13.2 kW
Round-Trip Efficiency (RTE)85.6%
PV DC Input (DC-Coupled)Yes (DC-Coupled Capable)
Nominal AC Grid Voltage240 Vac
Safety ListingUL 9540 (Ed. 3 : 2025)
Certifying LaboratoryIntertek

Single-Unit Blackout Runtime Estimates

Modeled as usable kWh × √(RTE) ÷ load kW (9.6 kWh × 92.5% one-way discharge efficiency) with no solar recharge. Reserve buffer (e.g., 10%–20% user reserve) reduces usable outage hours proportionally.

Single-Unit Outage Runtime Estimates for EnergyPro 13K+EnergyPack 500X2
Light Essentials (0.8 kW — fridge, Wi-Fi, lights)11.1 hrs
Standard Backup (1.5 kW — + sump/freezer/home office)5.9 hrs
Heavy Load / HVAC (4.5 kW continuous)2 hrs

Multi-Unit Stacking Matrix

Multi-Unit Battery Stacking Runtime Matrix for EnergyPro 13K+EnergyPack 500X2
UnitsTotal kWhCont. kW1.5 kW Backup4.5 kW HVAC
1×9.6 kWh13.2 kW5.9 hrs2.0 hrs
2×19.2 kWh26.4 kW11.8 hrs3.9 hrs
3×28.8 kWh39.6 kW17.8 hrs5.9 hrs
4×38.4 kWh52.8 kW23.7 hrs7.9 hrs

Outage Sizing Notes & FAQ — Shenzhen Poweroak Newener EnergyPro 13K+EnergyPack 500X2

When sizing a residential storage bank around the Shenzhen Poweroak Newener EnergyPro 13K+EnergyPack 500X2 (9.6 kWh usable, 13.2 kW continuous), evaluate both energy duration (kWh) and peak starting current (kW / LRA). On a typical 1.5 kW essential-loads subpanel, one unit delivers roughly 5.9 hours overnight before morning solar recharge begins. Under California NEM 3.0 or Time-of-Use (TOU) arbitrage rates, shifting 8–12 kWh per evening peak window aligns well with a single- or dual-unit stack, while multi-day winter storms or whole-home 240V central AC generally require 1× stacked units plus a compressor soft-start kit.

How long will one Shenzhen Poweroak Newener EnergyPro 13K+EnergyPack 500X2 run during a power outage?
Using one-way discharge efficiency (√85.6% ≈ 92.5%) on 9.6 kWh usable capacity without solar recharge, one EnergyPro 13K+EnergyPack 500X2 delivers approximately 11.1 hours at a 0.8 kW light-essentials load (fridge, Wi-Fi, LED lights) or 5.9 hours at a 1.5 kW standard backup load.
Can the Shenzhen Poweroak Newener EnergyPro 13K+EnergyPack 500X2 run a central air conditioner or heat pump?
A single unit supplies 13.2 kW continuous AC power, enough to sustain a 4.5 kW HVAC load for roughly 2 hours on battery alone. Always verify Locked Rotor Amps (LRA) compressor startup surge and install a soft-start kit if your condenser LRA exceeds inverter peak surge rating.
Is the Shenzhen Poweroak Newener EnergyPro 13K+EnergyPack 500X2 AC-coupled or DC-coupled, and what safety listing does it hold?
In the CEC registry (snapshot 2026-11-23), this LFP (LiFePO4) battery carries UL 9540 (Ed. 3 : 2025) certification (tested by Intertek) and is listed as DC-coupled capable with direct PV DC input. Confirm UL 9540 / UL 9540A spacing rules with your local AHJ.

More Shenzhen Poweroak Newener Energy Storage Models

EP800+B500X4 (19.84 kWh)EP900+B500X4 (19.84 kWh)EnergyPro 6K (7.68 kWh)EP800+B500X2 (9.92 kWh)EP900+B500X2 (9.92 kWh)EnergyPro 13K+EnergyPack 500X3 (14.4 kWh)All Shenzhen Poweroak Newener Equipment →