Sun Gold Power SGE-12K18MAX-314AO-1N2B (32.14 kWh)
12 kW, 32.14 kWh, energy storage system. Source: CEC Energy Storage System List (Nov 2026) · CEC listing date: · Registry snapshot: .

Storage Specifications & Safety Listing
| Manufacturer | Sun Gold Power |
|---|---|
| Model Number (MPN) | SGE-12K18MAX-314AO-1N2B |
| Battery Chemistry | LFP (LiFePO4) |
| Usable Energy Capacity | 32.14 kWh |
| Max Continuous Discharge | 10.24 kW |
| Round-Trip Efficiency (RTE) | 90% (Class Estimate — Not listed in CEC) |
| PV DC Input (DC-Coupled) | Yes (DC-Coupled Capable) |
| Nominal AC Grid Voltage | 240 Vac |
| Safety Listing | UL 9540 (Ed. 3 : 2023) |
| Certifying Laboratory | Intertek |
Single-Unit Blackout Runtime Estimates
Modeled as usable kWh × √(RTE) ÷ load kW (32.14 kWh × 94.9% one-way discharge efficiency) with no solar recharge. Reserve buffer (e.g., 10%–20% user reserve) reduces usable outage hours proportionally.
| Light Essentials (0.8 kW — fridge, Wi-Fi, lights) | 38.1 hrs |
|---|---|
| Standard Backup (1.5 kW — + sump/freezer/home office) | 20.3 hrs |
| Heavy Load / HVAC (4.5 kW continuous) | 6.8 hrs |
Multi-Unit Stacking Matrix
| Units | Total kWh | Cont. kW | 1.5 kW Backup | 4.5 kW HVAC |
|---|---|---|---|---|
| 1× | 32.1 kWh | 10.2 kW | 20.3 hrs | 6.8 hrs |
| 2× | 64.3 kWh | 20.5 kW | 40.7 hrs | 13.6 hrs |
| 3× | 96.4 kWh | 30.7 kW | 61.0 hrs | 20.3 hrs |
| 4× | 128.6 kWh | 41.0 kW | 81.3 hrs | 27.1 hrs |
Outage Sizing Notes & FAQ — Sun Gold Power SGE-12K18MAX-314AO-1N2B
When sizing a residential storage bank around the Sun Gold Power SGE-12K18MAX-314AO-1N2B (32.14 kWh usable, 10.24 kW continuous), evaluate both energy duration (kWh) and peak starting current (kW / LRA). On a typical 1.5 kW essential-loads subpanel, one unit delivers roughly 20.3 hours overnight before morning solar recharge begins. Under California NEM 3.0 or Time-of-Use (TOU) arbitrage rates, shifting 8–12 kWh per evening peak window aligns well with a single- or dual-unit stack, while multi-day winter storms or whole-home 240V central AC generally require 1× stacked units plus a compressor soft-start kit.