Reference US Solar ConfigurationOhio (OH)Avoided Cost

10.2 kW Trina + Hoymiles + Battery Solar Kit (Ohio)

Cost-Optimized Microinverter + Heavy LFP · Ohio 4-Season Hybrid. Reference Bill of Materials pairing 23× Trina Solar TSM-445NEG9RH.25 with 23× Hoymiles HMS-400-1A-NA and 1× Fortress Power eForce DC energy storage system-9.6P1-0.

System Size
10.23 kW DC / 8.33 kW AC
Est. Annual Yield
12,232 kWh
Est. Savings (OH)
$1,280/yr
Turnkey Cash Est.
$38,844Pre-incentive cash estimate
SYSTEM SINGLE-LINE ARCHITECTURE · OH RESIDENTIAL 240V SPLIT-PHASE 1. SOLAR ARRAY (23×) Trina Solar TSM-445NEG9… 10.23 kW DC STC DC 2. INVERTER (23×) Hoymiles HMS-400-1A-NA 8.33 kW AC · 240V 45A 3. MAIN PANEL & GRID 225A Busbar · NEC 705.12 45A Backfeed · OH Grid 4. HOME ENERGY STORAGE (1×) Fortress Power eForce DC energy… · 9.6 kWh

Reference Bill of Materials & NEC Summary

Bill of Materials for 10.2 kW Trina + Hoymiles + Battery Solar Kit (Ohio)
ItemManufacturerModelQtyElectrical RatingDatasheet
Solar ModulesTrina SolarTSM-445NEG9RH.2523×10.23 kW DC (490 sq ft)Panel Specs →
InverterHoymilesHMS-400-1A-NA23×8.33 kW AC · 1.23× DC/AC · 45A BreakerInverter Specs →
Energy StorageFortress PowereForce DC energy storage system-9.6P1-01×9.6 kWh usable capacityBattery Specs →

Cost & Sizing Notes for Ohio

Modeled at Ohio’s average residential electricity rate (16.1¢/kWh) under Avoided Cost, this 10.23 kW DC / 8.33 kW AC array produces an estimated 12,232 kWh/year (~$1,280/yr gross bill offset, simple pre-incentive payback ~30.3 years at the $38,844 pre-incentive cash estimate). Required south-facing unshaded roof area is approximately 490 sq ft, with a 1.23× DC/AC ratio and a 45A NEC 705.12 backfeed breaker. Always confirm local structural wind/snow loads and utility interconnection rules before ordering equipment.

What is included in the $38,844 estimate for this 10.23 kW Ohio solar kit?
The $38,844 figure is a pre-incentive 2026 turnkey cash estimate covering 23× Trina Solar TSM-445NEG9RH.25 panels, 23× Hoymiles HMS-400-1A-NA, 1× Fortress Power eForce DC energy storage system-9.6P1-0 (9.6 kWh), racking, permitting, and licensed installation in Ohio. It excludes expired federal Section 25D credits and any state or utility rebates you may qualify for.
Will this 10.23 kW solar kit fit on a standard 225A electrical panel under NEC 705.12?
At 8.33 kW continuous AC output, the inverter requires a 45A backfeed breaker (125% continuous duty). Under the NEC 705.12(B) 120% busbar rule, a standard 200A/200A panel allows up to a 40A solar breaker; if 45A exceeds 40A, a 225A busbar, main-breaker derate (175A), or supply-side tap is required.

More Reference Ohio Solar Kits

10.4 kW Qcells + Enphase + Battery Solar Kit (Ohio)11.0 kW REC + Tesla + Battery Solar Kit (Ohio)10.6 kW Silfab + Sol-Ark + Battery Solar Kit (Ohio)10.6 kW JinkoSolar + EG4 + Battery Solar Kit (Ohio)All 120 Kits →