Reference US Solar ConfigurationArizona (AZ)Avoided Cost

12.0 kW Qcells + Fronius + Battery Solar Kit (Arizona)

Austrian Hybrid Engineering + HV LFP Storage · Arizona Peak-Summer AC. Reference Bill of Materials pairing 29× Qcells (Hanwha) Q.TRON BLK M-G2.D+ 415 with 1× Fronius Primo GEN24 10.0 208-240 and 2× Pylontech Force-H3-102.4/204.8-US.

System Size
12.04 kW DC / 10.02 kW AC
Est. Annual Yield
21,938 kWh
Est. Savings (AZ)
$2,973/yr
Turnkey Cash Est.
$52,296Pre-incentive cash estimate
SYSTEM SINGLE-LINE ARCHITECTURE · AZ RESIDENTIAL 240V SPLIT-PHASE 1. SOLAR ARRAY (29×) Qcells (Hanwha) Q.TRON… 12.04 kW DC STC DC 2. INVERTER (1×) Fronius Primo GEN24 10.0… 10.02 kW AC · 240V 60A 3. MAIN PANEL & GRID Line-Side Tap Required 60A Backfeed · AZ Grid 4. HOME ENERGY STORAGE (2×) Pylontech Force-H3-102.4/204.8-… · 20.5 kWh

Reference Bill of Materials & NEC Summary

Bill of Materials for 12.0 kW Qcells + Fronius + Battery Solar Kit (Arizona)
ItemManufacturerModelQtyElectrical RatingDatasheet
Solar ModulesQcells (Hanwha)Q.TRON BLK M-G2.D+ 41529×12.04 kW DC (590 sq ft)Panel Specs →
InverterFroniusPrimo GEN24 10.0 208-2401×10.02 kW AC · 1.2× DC/AC · 60A BreakerInverter Specs →
Energy StoragePylontechForce-H3-102.4/204.8-US2×20.5 kWh usable capacityBattery Specs →

Cost & Sizing Notes for Arizona

Modeled at Arizona’s average residential electricity rate (15.4¢/kWh) under Avoided Cost, this 12.04 kW DC / 10.02 kW AC array produces an estimated 21,938 kWh/year (~$2,973/yr gross bill offset, simple pre-incentive payback ~17.6 years at the $52,296 pre-incentive cash estimate). Required south-facing unshaded roof area is approximately 590 sq ft, with a 1.2× DC/AC ratio and a 60A NEC 705.12 backfeed breaker. Always confirm local structural wind/snow loads and utility interconnection rules before ordering equipment.

What is included in the $52,296 estimate for this 12.04 kW Arizona solar kit?
The $52,296 figure is a pre-incentive 2026 turnkey cash estimate covering 29× Qcells (Hanwha) Q.TRON BLK M-G2.D+ 415 panels, 1× Fronius Primo GEN24 10.0 208-240, 2× Pylontech Force-H3-102.4/204.8-US (20.5 kWh), racking, permitting, and licensed installation in Arizona. It excludes expired federal Section 25D credits and any state or utility rebates you may qualify for.
Will this 12.04 kW solar kit fit on a standard 225A electrical panel under NEC 705.12?
At 10.02 kW continuous AC output, the inverter requires a 60A backfeed breaker (125% continuous duty). Under the NEC 705.12(B) 120% busbar rule, a standard 200A/200A panel allows up to a 40A solar breaker; if 60A exceeds 40A, a 225A busbar, main-breaker derate (175A), or supply-side tap is required.

More Reference Arizona Solar Kits

12.0 kW Qcells + Enphase + Battery Solar Kit (Arizona)12.3 kW REC + Tesla + Battery Solar Kit (Arizona)12.3 kW Silfab + Sol-Ark + Battery Solar Kit (Arizona)13.2 kW JinkoSolar + EG4 + Battery Solar Kit (Arizona)All 120 Kits →