8.4 kW REC + SMA Solar Kit (Illinois)
German-Engineered Hybrid + Modular LFP Backup · Illinois SREC Value. Reference Bill of Materials pairing 19× REC Solar REC440AA Pure-RX-DC with 1× SMA Solar SBSE7.7-US-50.
System Size
8.36 kW DC / 7.62 kW AC
Est. Annual Yield
10,472 kWh
Est. Savings (IL)
$1,123/yr
Turnkey Cash Est.
$24,662Pre-incentive cash estimate
Reference Bill of Materials & NEC Summary
| Item | Manufacturer | Model | Qty | Electrical Rating | Datasheet |
|---|---|---|---|---|---|
| Solar Modules | REC Solar | REC440AA Pure-RX-DC | 19× | 8.36 kW DC (413 sq ft) | Panel Specs → |
| Inverter | SMA Solar | SBSE7.7-US-50 | 1× | 7.62 kW AC · 1.1× DC/AC · 40A Breaker | Inverter Specs → |
Cost & Sizing Notes for Illinois
Modeled at Illinois’s average residential electricity rate (16.5¢/kWh) under Avoided Cost, this 8.36 kW DC / 7.62 kW AC array produces an estimated 10,472 kWh/year (~$1,123/yr gross bill offset, simple pre-incentive payback ~22.0 years at the $24,662 pre-incentive cash estimate). Required south-facing unshaded roof area is approximately 413 sq ft, with a 1.1× DC/AC ratio and a 40A NEC 705.12 backfeed breaker. Always confirm local structural wind/snow loads and utility interconnection rules before ordering equipment.
What is included in the $24,662 estimate for this 8.36 kW Illinois solar kit?
The $24,662 figure is a pre-incentive 2026 turnkey cash estimate covering 19× REC Solar REC440AA Pure-RX-DC panels, 1× SMA Solar SBSE7.7-US-50, racking, permitting, and licensed installation in Illinois. It excludes expired federal Section 25D credits and any state or utility rebates you may qualify for.
Will this 8.36 kW solar kit fit on a standard 200A electrical panel under NEC 705.12?
At 7.62 kW continuous AC output, the inverter requires a 40A backfeed breaker (125% continuous duty). Under the NEC 705.12(B) 120% busbar rule, a standard 200A/200A panel allows up to a 40A solar breaker; if 40A exceeds 40A, a 225A busbar, main-breaker derate (175A), or supply-side tap is required.